Metrovancouver Solar System
This is a five panel Design /Build Domestic Hot Water retrofit project with evacuated tubes and a drain back tank/control configuration. It included extensive involvement and collaboration with key plumbing inspectors and Metrovancouver authorities.
read moreFuhrman Construction Commercial HVAC Retrofit
Complete HVAC Design Build retrofit job on main Street. Two new Rooftop units with proper zone dampers and ductwork, and 2 new split systems. Also existing restaurant ventilation and exhaust evaluation.
read moreRCMP Whistler Solar System
This is a six panel Design Assist Domestic Hot Water project with evacuated tubes. It included a review of the consultant’s (Stantec) original oversized selection of 9 panels and their approval of our suggested reduction to 6 panels.
read moreFir St Commercial HVAC/Plumbing Retrofit
Complete HVAC/Plumbing Design Assist retrofit job on Fir Street in Kitsilano. Included recommendations to Mechanical Consultant to Increase zoning to 9 zones split ducted systems. Extensive communication with the City’s plumbing department provided significant savings to the Client.
read moreCorporation of Delta Solar System
This is a two panel Design /Build Domestic Hot Water retrofit project with evacuated tubes. It included extensive involvement and collaboration with key plumbing authorities.
read moreWhite Rock Boiler Replacement
Replacement of 6 exisitng boilers providing space heating and domestic hot water with two new Viessmann condensing boilers (800,000 Btu/Hr ea). Changeover was achieved in 6 hrs with minimal disruption to the residents.
read more